Sports ground update

Work is progressing well – Dec 2017

Construction of Perimeter Wall – Sports Ground

Boundary wall along school side and nehr side to consist of the following;

1. 4 inch buttee base
2. 12 inch brick subsoil wall
3. 18 inch brick visible wall
4. Top of wall reinforced with 12mm surya (rebarr)
5. Top of wall to be finished with concrete apex
6. 9 9nch wide concrete pillars with 4x12mm surya base
7. Pillar height 2.5 feet above wall with 2 equal spaced holes for plastic coated boundary wire
8. Pillars to have 18×18 inch concrete base with steel mesh
9. Field sids to be barbed wire fence mounted on 6 foot concrete posts spaced 10-12 foot apart
10. Space to be left for 12 foot entrance by nehr
11. Zig zag entrance by school

3 quotes were obtained for the specification for the perimeter wall.  The best quote for 55,000 rupees was from Lekraj for labour only (other quotes were 80,000 and 60,000)  The best brick supply was from Bobby at 4450 rupees per thousand including tax, cement would be supplied at cost price at the time.  We thank Bobby for his support in materials.

Images supplied by project lead Manjit Singh

IMG-20171125-WA0003perimeter wall IMG-20171210-WA0003_LI

Cattle restrictor gateTractor access

To date we are still waiting for Sarpanch Sahib to arrange accurate measurement of the plot so that we can finalise the 2 sides adjacent to ploughed fields. Access to water for irrigation has been verbally agreed with water committee members. We have requested this to be confirmed in writing from Sarpanch Sahib.

The Trust have also paid for the clearance of the area around the water tank so that it can be used by children until the ground is ready.

IMG-20171104-WA0008IMG-20171104-WA0007IMG-20171104-WA0002IMG-20171104-WA0006